Ward door installation process and precautions

2022-09-09 09:52:30
a

The focus of ward door is to prevent electromagnetic radiation, manufacture excellent safety protection technology, and pay attention to exquisite modeling design and effective overall design. It has become a popular choice for safety protection of radioactive main room. What is the installation process of Xuanyuanmen disease room door

1. Preparation before production

Before installation, you must go to the construction site, carefully check the components, total number and specifications of safety protection doors and windows, and budget the total number and specifications of production.

2. Accurate line drawing and positioning

According to the specification, design elevation and opening direction required in the design drawing, mark the installation position line of the door frame at the edge of the hole, and make accurate positioning to avoid errors and misplacements when installing the special door for the hospital.

3. Vertical frame calibration

After the special protective door is in place, the flatness should be calibrated first before installation, and adjusted to the same installation height. According to the provisions of the design scheme, the same spacing and internal and external wall tiles. In addition, the left and right width of the special hospital door should also be consistent.

4. Fixed connection

The ward door should be temporarily fixed with anchor bolts and checked for compliance with the installation specifications. Accurate fixation before installation is the premise for installing the special hospital door according to the standard.

5. Installation of protective door

Before the installation of doors and windows, on-site dimension inspection shall be carried out, and the engineering drawings and relevant design budget estimates shall be reviewed, verified and safety technical disclosure shall be carried out. The opening position shall be clear. The installation of doors and windows shall be carried out in strict accordance with the design scheme and relevant standards.

6. Installation of ward door parts

Before the construction of Xuanyuanmen sick room door installation project, the door frame slot hole should be careful not to leave dirt. Exposed pipes shall be bonded to maintain overall consistency. The hardware is firmly installed, not loose, and easy to open.